Project > Documents
Work product
(updated often)
The most recent prototype (5-17-06)
Pre-shift Lesson Level Flowchart
Emergency Situations Realignment
Pre-shift Lesson Level Diagram (revision 1)
Emergency Situations Flowchart
Pre-shift Preassessment Flowchart
Emergency Situations Mock Up (revised)
Pre-shift Preassessment Description
Continuous Miner Fire Doc
(
Part I
,
Part II
)
Pre-shift Preassessment Storyboards (rough)
Emergency Situations Lesson Map
Check Roof and Ribs Flowcharts (revision 2)
Emergency Situations Storyboards
Storyboard Map (revision 1)
Evaluation Plan
Interface Mockups (
1
,
2
,
3
,
4
,
5
)
Media Capture Request Records
Job Task Analysis (JTA)
Correspondence
Condensed Generic JTAs
Project kickoff meeting minutes
Job Task Analysis (all 12)
SME Initial Contact Letter
Conduct Pre-shift Examination (
spider
|
pdf
)
Client response to initial email
Emergency & Unusual Situations (
spider
|
pdf
)
PA/NA update memo
Initial Analysis and Research
Performance Analysis (PA)
Performance Analysis revision topics
User Roles
Needs Assessment (NA)
Learner Analysis
Task Analysis
Section Foreman Survey
(and results)
Presentations
Performance Analysis Presentation (Fall 2005)
Final Presentation (Fall 2005)
Final Design Document (Fall 2005)
Final Presentation (Spring 2006)
Final Design Document (Spring 2006)
Project
Instructional Technology
George Mason University