Date: 2/4/04
Time: 10-1
Next
Meeting: Feb. 5,2004
Attendees:
Justin, Jocelyn, Nantana, Monisha, Mike, Pat Abrams
Absentees:
Tabitha, Barbara
Discussion (with Mike):
- Verify:
read-only searchable database by the end of March/beginning of April
§
Upon completion: conduct usability testing at Richmond on 10
proposals entered into the system.
- Define
the category scheme & verify the categories
§
10 primary categories, 16 subcategories
§
7 categories that we came up with: 6 goals, year started,
division, region, school size, school type (urban, rural, suburban), and budget
- Bridge
the gap between us and VDOE. (Tara or Barbara’s name to looked out for
during client contact.
§
We need the verification of the rubric and the sections that
we put it in
§
Meeting with TA’s on Monday: 2/23. (We will send the agenda
by next week to Susan.
- We
would like to have a one-person contact: Susan / Steve to call or email.
(Interim
questions during the design process.
- Clarification:
How are the TA’s dealing with proposals that are not in accordance to
the
categories on ttaconline site.
§
Will they be forcing the categories themselves as discussed
in December’s presentation or
§
Do we need to send them the categories (primary) for the new
set of proposals that they have received/ will receive.
- Scanned
documents are in an unreadable format. Paper based proposals required to
start work.
Notes:
IFSP= Individual family service plan for birth to 3 years
504= disability that does not require and IEP and just
requires an adapted plan
IEP= Individual Education Plan
Future Meetings with Pat:
- February
18th: from 12-1
- March
3rd: 12-1
- April
21st: 12-1
- May 5th:
12-1
Discussion/Agenda (with Pat and Susan): Red=responses
- On
Monday-updated TA’s on what we are doing as a group.
- On
Tuesday (yesterday)- we sent a email to Susan titled ‘rubric verification’
with a attachment of the rubric that according to the VDOE web-site is currently used by the
TA's as a LIP evaluation mechanism.
- This rubric is used by Pat
- Schedule
a presentation in late March/early April that will have a prototype of a
searchable database with 10 example real proposals.
- Mike-in
July we will have the rest of the database
- Monday,
March 29th: present working prototype at TA meeting 10a-11a
- Tuesday,
April 20th : present prototype at VDOE with TTAC1 between
10-12
- To
make sure we are all on the same page: run through the concept map (see
attachment 2)
- We
have identified 7 searchable items other than the primary and secondary
categories that are already on the site, they are:
- The
6 goals (including 1 other category)-state goals
have changed so use general categories, also the goals are always
changing so general would be better
- Year
started- keep in mind the school timeline is
from, for example: July 1, 2003 to June 30, 2004
- Division
(vs state operated programs (SOP)
- Region
- School
size (automatic fill in according to division so
that the TA’s do not need this knowledge)
- School
type: urban, rural, suburban
- Budget
(LIP award)
- Completed v uncompleted proposals
- Who
should we use as a contact for the TA’s?
Susan Mesling (Phone 804-786-9775)?
- Do
you want to be copied with the emails that are sent? YES
- Are
we able to meet with the TA’s on February 23rd, or should we
meet only with you? Only meet with Pat until then,
any other questions that come up should be funneled through Susan
- If
we can meet with the TA’s we would like to: verify the concept map,
discuss categories for the database, update them on where we are and
progress that we have made in design
Notes:
·
We are going to have to put together an instruction packet
and procedure manual for the TA’s to use when inputting data
·
Mike-update Ken Olsen with a status report (TA’s are meeting
with him on March 5th) =we are doing this for him.
Plan/Goals for Next Meeting:
- Compile exercises that we have
done individually:
- Ex 29, pg138, ex38, pg172, ex
43, pg193, ex45, pg 197, ex47, pg 204
- Review the evaluation plan
- Put
together a document that explains the LIP process as we see it.