Accomplishments: |
Held joint
meeting with T/TAC Group Two and Mike to prepare presentation for the
Virginia Directors of Special Education quarterly meeting on April 20.
Presentation scope and strategy was determined, responsibilities were
assigned and weekly meetings were scheduled. Additional information
at:
http://immersion.gmu.edu/ttac/spring2004/group1/docs/CR_MB_2004_0331.html
Development phase
of online content development training continues with storyboards.
Team submitted results of testing of Issues Tracking database to Leslie.
As of 3/30/04 we had 10 critical, 24 high, 44 medium, and 51 low severity
issues which are unresolved.
Two more usability test have been completed with the participants
reviewing the new tutorials prior to attempting to build a webshop.
A survey was sent out to T/TAC staff members to ascertain graphic
handling capabilities and access to graphics programs. Results have
come in and are being collated.
Contacted Shuangbao, Shawn Miller and GMU Media Center to access resources
required for revisions of Introduction to T/TAC Online video. Shuangbao
provided CD with original file.
|
Plans: |
Continue
development phase of online content development training. Complete storyboards,
finalize content.
Presentation teams
to review assigned sections of site to start preparation of personas
for presentation and review from user-perspective to identify fuctionality
issues.
Meet with T/TAC Group Two, Mike and Shuangbao on Wednesday to review
status of site from user perspective in preparation for April 20 presentation.
Follow-up with GMU Media Center to acquire a copy of Producer for
revision of Introduction to T/TAC Online video.
Review Introduction to T/TAC Online video to write required copy changes
and document required image changes.
Summarize staff survey on graphics ability and program access.
Update tutorials based on feedback gathered from recent usability
tests and reviews.
Create several small Webshops that deal with various aspects of creating
webshops.
Update database with usability issues discovered in
the most recent usability tests.
|
Issues
/ Concerns: |
Need
to organize and prioritize site issues maximize use of Shuangbao's time
between now and site launch.
There are several projects in the works which need elements in synch with
the final project (Mary's course, system tutorials, video clip and content
development tutorial). In order for the site and the supporting materials
to match as of April 20, visual changes to the final site need to be completed
asap. (This may or may not be an issue as emails from Shuangbao indicate
he is working on updates to the visuals this week.) |
Other: |
|