Weekly
Schedule |
Topic/Activities
|
Assignments/Resources
for next session
|
|
Week
1 |
Introductions,
Immersion Experience, Portfolio
|
Mon, Aug 28 |
EDIT 730 @ 4:30, EDIT 797 @ 7:20 |
|
Tues, Aug 29 |
Meeting: 9:00
- 3:30 pm Commerce Lab 1
KICKOFF MEETING @ 9:30
- Welcome/Introductions
- Overview of Immersion Experience - a different experience
- Review action learning paper
- Schedule and time commitment
- Brief introduction to projects
- Review Immersion Website, Requirements & Assessment
- Resources: Mason
Media Lab and Star
Workshops
- Shields Activity
| Textbooks
(Required For MSHA Team):
- The 17 Essential Qualities of a Team Player- Maxwell
- Teamwork from the Inside Out Fieldbook: Exercises and Tools for Turning
Performance Inside Out – Bolin & Nash
- e-Learning and the Science of Instruction - Clark & Mayer
- Instructional Design
(third edition) - Smith & Ragan
- Real World Instructional Design - Cennamo & Kalk
- Online Learning:
Concepts, Strategies, & Application - Dabbagh & Bannan-Ritland
Assignments:
- Review Immersion Site (expectations, rubrics, etc.)
- Review Portfolios (MSHA, TTAC, KiHD)
- Read Nash & Bolin
(N&B) Intro and Chapter 1
|
Wed, Aug.30 |
Meeting: 9:00 - 3:30 pm Commerce Lab I
10-12 meet with immersion faculty
- Review Immersion
Site items not discussed previously, any questions?
- Demonstrate
Portfolios Requirements: 1, 2, 3, 4, 5, 6
- Demonstrate Project
Sites
- Discuss
N&B
1 PM
- Meet with Ruming
to go over procedures for uploading project site and portfolios (1
pm)
|
Assignments:
- Determine individual
learning goals for semester and begin developing individual Web-based
portfolio
- Read N&B chapter
2
|
Thur, Aug 31 |
Meeting:
9:00 - 3:30 pm Commerce Lab 1
9 - 10
- Teams meet to
determine weekly meeting times, review project site responsibilities,
determine roles, and assess how to begin development of project website
10 - 11
11-12:30
- Individual
team time with faculty to discuss project
1:30 - 3:30
- Continue individual
team time with faculty to discuss project
- Work on project website
|
Assignments:
- Read N&B Chapters
4-6 for Tuesday September 5
- Work on individual web-based portfolios
- Review
MSHA project website, specifically, click on "project" then "documents"
and review the links under "Initial Analysis and Research". Also, click
on "resources" and review the links under "Research Data, Reports" and
"Miscellaneous" (focus on the CDC/NIOSH Aging Workforce Report, MSHA
SOW, and NIOSH Grant Proposal).
|
|
Fri, Sept 1 |
No face-to-face meeting |
|
Week 2 |
Teamwork and Detailed Discussion of Immersion Projects |
Mon, Sept 4 |
LABOR DAY NO CLASSES |
|
Tue, Sept 5 |
Meeting:
9:00 - 3:30 pm Commerce Lab 1 10 - 11 11 - 12:30
- Individual team
time with faculty to discuss projects (finish
viewing last year's presentation)
- Discuss
recommendations, formative evaluations, PA/NA
1:30
- 3:30
- Continue individual
team time with faculty to discuss project
- Work on project
website
|
Assignments:
1) Continue to review
last year's MSHA project site, prototype and associated materials (especially
the final design document, recommendaitons, results of prototype formative
evaluations)
2) Work on new project site, individual portfolio
4) Review
Tuckman model
|
Wed, Sept 6 |
Meeting:
9:00 - 3:30 pm Commerce Lab I
10 - 11
- Discuss N&B chapters 4-6
- Discuss Tuckman model
11
- 12:00
- Individual team
time with faculty to discuss projects
- Discuss
recommendations, formative evaluations, PA/NA
1:00
- 3:30
- Continue individual
team time to discuss project
- Work on project
website, team vision and norms
|
Assignments:
1) Continue to review
MSHA project site, prototype and associated materials
2) Establish and write Team
Vision and Norms
3) Discuss and determine group meeting protocol
4) Review Forming Groups
|
Thur, Sept 7 |
Meeting:
9:00 - 3:30 pm Commerce Lab I
10 - 12
- Disuss Tuckman Model and Forming Groups
1 - 3:30
- Work on project website,
team vision and norms
- Determine specific
project goals, timeline, PA/NA goals
|
Assignments:
- Read Maxwell chapters
1-17 for Tuesday September 12
- Work on portfolio/reflection
|
Fri, Sept 8 |
No face-to-face meeting
- Post Status report
- Post individual portfolio
reflection
|
|
Week
3 |
Planning, Data-gathering & Performance Analysis |
Mon, Sept 11 |
Photoshop Workshop, 10-12, Johnson Center, Room 344
EDIT 730 @ 4:30, EDIT 797 @ 7:20
|
Tues, Sept 12 |
Meeting:
9:00 - 3:30 pm Commerce Lab I
10-11
- Present status
report and discuss week's action plan
- Discuss how action plan aligns with PA/NA
11-12:30
- Discuss Chapters
1-7 Maxwell
1:30 - 3:30
- Work on project
- Discuss PA approach (formative evaluation of prototype)
- Discuss how to send a package (report plus prototype) to SMEs for feedback
|
- Continue to
review project site, prototype and associated materials (focus on JTAs and associated word tables )
- Identify
client and goals for project, drivers, barriers, information sources
- Finish team goals,
norms, and roles
- Read N&B chapter 9
|
Wed, Sept 13 |
Meeting:
9:00 - 3:30 pm Commerce Lab I
10-12
- Discuss Maxwell
Chapters 8-17& N&B chapter 9
1 - 3:30 (individual team time with faculty)
- Prepare questions
for SMEs
- Discuss
recommendations from previous team and formative evaluation instruments
and results (what should we change for the next round of evaluations?)
- Discuss how to send a package (report plus prototype) to SMEs for feedback
|
- Work on project goals, PA/NA goals, formative evaluation instruments and feedback, etc.
- Prepare questions for SMEs
- Review JTAs
|
Thur, Sept 14 |
Meeting:
9:00 - 3:30 pm Commerce Lab I
- Myers
Briggs Session I (10-3)
|
- Finalize project website structure
- Finalize package for SMEs
- Review all data results from survey, interviews, formative evaluation, etc.
- Prepare questions for Monday's 730 class (members from last year's MSHA team will be attending)
|
Fri, Sept 15 |
Meeting:
9 - 2 pm Commerce Lab I
Post status/meetings reports (by 5 pm)
|
- Read/review
Smith & Ragan
chapters 3, 5, & 7 for Thursday September 21
- Continue to review project site, prototype and associated materials (focus on JTAs of SOW duties, data results)
- Finalize client intro letter
|
Week
4 |
Performance
Analysis/Needs Analysis/Task Analysis |
Mon, Sept 18 |
EDIT 730 @ 4:30, EDIT 797 @ 7:20
Client Meeting/SMEs (5-7)
Library Tour 1 - 3 PM (JC Library) |
|
Tues, Sept 19 |
Meeting: 9:00
- 3:30 pm Commerce Lab I
10 - 11 (all immersion)
- Present status report and discuss week's action plan
11 - 12 (individual team time with faculty)
- Discuss Smith & Ragan chapters 3, 5, & 7
1 - 3:30
- Prepare for workforce connections training
- Work
on project (see list across)
|
- Review JTAs (spiders) for the duties that we are developing
- Validate JTAs with prototype (what has been developed - what needs to be developed)
- Develop a checklist or visual of what needs to be developed for each of the duties (task analysis)
- Prepare questions for SME visit
|
Wed, Sept 20 |
Meeting: 9:00 - 3:30 pm Commerce Lab I
- Workforce connections training session (10-3)
|
- Prepare questions for SME visit
- Work on task analysis/JTA analysis
|
Thur, Sept 21 |
10 - 12
1 - 3:30 (individual team time with faculty)
- Recap workforce connections session
- Discuss Smith & Ragan
|
- Review JTAs (spiders) for the duties that we are developing
- Validate JTAs with prototype (what has been developed - what needs to be developed)
- Develop a checklist or visual of what needs to be developed for each of the duties (task analysis)
- Prepare questions for SME visit
|
Fri,
Sept 22 |
No face to face Meeting:
- Post status/meeting reports
- Post individual portfolio reflection
|
|
Week
5 |
Performance Analysis/Needs Analysis/Task Analysis
|
Mon, Sept 25 |
Photoshop Workshop, 10-12, Johnson Center, Room 344
EDIT 730 @ 4:30, EDIT 797 @ 7:20
|
|
Tues, Sept 26 |
Meeting: 9:00 - 3:30pm Commerce Lab I
10 - 11 (individual team time with faculty)
11- 3:30 (SME visit - Paul Bizich and Don Conrad)
|
- Work on performance/needs
analysis document
|
Wed, Sept 27 |
Meeting: 9:00 - 3:30pm Commerce Lab I
9:30 - 3:30 (SME visit - Paul Bizich and Don Conrad)
|
- Work on draft of performance/needs analysis document
- Discuss results of SME visit
|
Thur, Sept 28 |
Meeting: 9:00 - 3:30pm Commerce Lab I
10-12
- Work on project (PA/NA, data gathering, data analysis, task analysis)
- Discuss barriers, drivers, info sources, etc.
1-3:30 (individual team time with faculty)
- Discuss results of SME visit
|
• Work on draft of performance/needs analysis document
• Discussion of initial performance/needs analysis data
• Discuss additional data gathering methods
|
Fri, Sept 29 |
No face to face meeting:
- Post status/meeting reports
|
|
|
Week 6 |
Performance Analysis/Needs Analysis/Task Analysis
|
Mon, Oct 2 |
EDIT 730 @ 4:30, EDIT 797 @ 7:20
Dr. David Wiley - Learning Objects 12-2 (via Polycom) |
|
Tues, Oct 3 |
Meeting: 9:00 - 3:30 pm Commerce Lab I
|
Prepare for mine visit and academy visit
|
Wed, Oct 4 |
Meeting: 9:00 - 3:30 pm Commerce Lab I
|
Prepare for mine visit and academy visit |
Thur, Oct 5 |
Meeting: 9:00 - 3:30 pm Commerce Lab I
|
Prepare for mine visit and academy visit
|
Fri, Oct 6 |
MSHA team travels for mine visit
|
|
Week 7 |
Finalize Performance Analysis Briefing Report
|
Mon, Oct 9 |
NO CLASS COLUMBUS DAY |
|
Tues, Oct 10 |
MSHA team travels to mine academy
|
|
Wed, Oct
11 |
MSHA team at mine academy
|
|
Thur, Oct 12 |
MSHA team at mine academy
|
|
Fri, Oct 13 |
No face to face Meeting - Post status report
- Post individual reflection
| 1) Finalize performance analysis document and presentation |
Week
8 |
Finalize Performance Analysis Briefing Report
|
Mon, Oct 16 |
EDIT 730 @ 4:30, EDIT 797 @ 7:20
Presentation by Sushant 10 -12
|
|
Tues, Oct 17 |
Meeting: 9:00 - 3:30 pm Commerce Lab I
|
- Work on aligning JTAs with lesson topics (gas testing & ventilation, dust control, record keeping, roof & rib control, cleanup program or general housekeeping, fire hazards, and guarding)
- Finalize the project website in Mod X (upload all documents, etc.)
- Align JTAs with regulations
- Examine all documents and media from mine and academy visit
- Examine examples of MSHA courses in Workforce Connections
- Select appropriate media for preshift and emergency and unusual situations
- Select appropriate scenarios for the different lesson topics from the various sources (e.g., violations, regulations, call out reports, fatalgrams, NIOSH materials, documents that we received from SMEs)
|
Wed, Oct 18 |
Meeting: 9:00 - 3:30 pm Commerce Lab I |
- Work on aligning JTAs with lesson topics (gas testing & ventilation, dust control, record keeping, roof & rib control, cleanup program or general housekeeping, fire hazards, and guarding)
- Finalize the project website in Mod X (upload all documents, etc.)
- Align JTAs with regulations
- Examine all documents and media from mine and academy visit
- Examine examples of MSHA courses in Workforce Connections
- Select appropriate media for preshift and emergency and unusual situations
- Select appropriate scenarios for the different lesson topics from the various sources (e.g., violations, regulations, call out reports, fatalgrams, NIOSH materials, documents that we received from SMEs)
|
Thur, Oct 19 |
Meeting: 9:00 - 3:30 pm Commerce Lab I
- 10-12 Discuss readings (Smith and Ragan)
- Work on Design Approach
|
- Work on aligning JTAs with lesson topics (gas testing & ventilation, dust control, record keeping, roof & rib control, cleanup program or general housekeeping, fire hazards, and guarding)
- Finalize the project website in Mod X (upload all documents, etc.)
- Align JTAs with regulations
- Examine all documents and media from mine and academy visit
- Examine examples of MSHA courses in Workforce Connections
- Select appropriate media for preshift and emergency and unusual situations
- Select appropriate scenarios for the different lesson topics from the various sources (e.g., violations, regulations, call out reports, fatalgrams, NIOSH materials, documents that we received from SMEs)
|
Fri, Oct 20 |
No face to face Meeting
- Post status report
- Post individual reflection
|
1) Review
Writing Good Work Objectives
|
Week
9 |
Content Analysis & Learning Objectives
|
Mon, Oct 23 |
EDIT 730 @ 4:30, EDIT 797 @ 7:20
ISD Panel 12-2
Briefing Report Due (PA/NA) - EDIT 730
Present Briefing Report to Client |
- Provided handout on GBS (Goal Based Scenarios) to read for Thursday
- Will provide handouts on chapters 2, 3, & 5, from Constantine & Lockwood's "Software for Use"
|
Tues, Oct 24 |
Meeting: 9:00 - 3:30 pm Commerce Lab I
- All immersion status update 11-12 (present status reports)
- Meet with Dr. Dabbagh 1-2 (if needed)
|
- Work on aligning JTAs with lesson topics and regulations
- Finalize the project website in Mod X (upload all documents, etc.)
- Examine all documents and media from mine and academy visit
- Examine examples of MSHA courses in Workforce Connections
- Select appropriate media for preshift and emergency and unusual situations
- Select appropriate scenarios for the different lesson topics from the various sources (content analysis)
- Work on design approach and learning objectives
|
Wed, Oct
25 |
Meeting: 9:00 - 3:30 pm Commerce Lab I
- Tara Laskowski will interview team about mine visit and project @ 11:30
|
- Work on aligning JTAs with lesson topics and regulations
- Finalize the project website in Mod X (upload all documents, etc.)
- Examine all documents and media from mine and academy visit
- Examine examples of MSHA courses in Workforce Connections
- Select appropriate media for preshift and emergency and unusual situations
- Select appropriate scenarios for the different lesson topics from the various sources (content analysis)
- Work on design approach and learning objectives
|
Thur, Oct 26 |
Meeting: 9:00 - 3:30 pm Commerce Lab I
- Discuss readings with Dr. D. @ 10 am
- Discuss Konosky's section foreman checklist and Adkins (PSU) materials
|
- Continue to examine all documents and media gathered
- Select appropriate media for preshift and emergency and unusual situations
- Select appropriate scenarios for the different lesson topics from the various sources (content analysis)
- Work on design approach and learning objectives
|
Fri, Oct 27 |
No face to face Meeting
- Post status report
- Finalize mid semester individual portfolio
|
Readings for next week - Read chapters 3, 4, & 5, in Real World Instructional Design text
- Read chapters 1 - 6 in E-Learning and the Science of Instruction:
- Allison will present chapters 1&2 on Thursday November 2
- Joe will present chapters 3&4 on Thursday November 2
- Rashmi will present chapters 5&6 on Thursday November 2
|
Week
10 |
Design & Development
|
Mon, Oct 30 |
EDIT 730 @ 4:30, EDIT 797 @ 7:20
Mid point portfolio review (at least 4 substantive reflections and all contributions documented)
Gaming conference for Hoop Magic |
- Finalize interface/skin design approach (send to Courtney Cox)
- Finalize scenario-based strategy
|
Tues, Oct 31 |
Meeting: 9:00 - 3:30 pm Commerce Lab I
- Gaming conference for hoop magic
- Meet with Dr. D. at 10 am (present status report, discuss Real World ID readings)
|
- Begin building/converting scenario-based content in WC for duties 9 and 11: pre-shift and emergency and unusual situations
- Work on expanded needs analysis (include, summarize, or integrate analysis from last year's project, e.g., final survey data, interviews, prototype evaluations, etc.)
|
|
Wed, Nov 1 |
Meeting: 9:00 - 3:30 pm Commerce Lab I
|
- Design & develop content for pre-shift and emergency and unusual situations duties in WC
- Work on expanded needs analysis
|
Thur, Nov 2 |
Meeting: 9:00 - 3:30 pm Commerce Lab I
- Discuss/present readings @ 10 am (Clark & Mayer readings)
|
- Design & develop content for pre-shift and emergency and unusual situations duties in WC
- Work on expanded needs analysis
|
Fri, Nov 3 |
No face to face meeting
- Post status report
- Post reflection
|
- Read chapters 7 - 10, & 13 in E-Learning and the Science of Instruction:
- Abi will present chapters 7& 8 on Tuesday November 7
- Tangie will present chapters 9&10 on Tuesday November 7
- Dr. D. will discuss chapter 13 on Tuesday November 7
|
Week
11 |
Design & Development
|
Mon, Nov 6 |
Present Expanded Needs Analysis in EDIT 730
ModX workshop (TBC) |
- Design & develop content for pre-shift and emergency and unusual situations duties in WC
|
Tues,
Nov 7 |
Meeting: 9:00 - 3:30 pm Commerce Lab I - Meet with Dr. Dabbagh 10 to discuss readings
- All immersion status update 11-12 (present status reports)
|
- Design & develop content for pre-shift and emergency and unusual situations duties in WC
|
Wed, Nov 8 |
Meeting: 9:00 - 3:30 pm Commerce Lab I
|
- Design & develop content for pre-shift and emergency and unusual situations duties in WC
|
Thurs, Nov 9 |
Meeting: 9:00 - 3:30 pm Commerce Lab I
|
- Design & develop content for pre-shift and emergency and unusual situations duties in WC
|
Fri, Nov 10 |
No face to face meeting - Post Status Report
- Post reflection
|
- Work on Task Analysis - Related Task Analysis Readings: (Read/Review)
- Jonassen: Chapter 8
- Smith & Ragan: Chapter 5
- IDKB:
http://classweb.gmu.edu/ndabbagh/Resources/IDKB/task_analysis.htm
http://lsit.coe.ecu.edu/colaric/KB/TaskAnalysis.html
|
Week 12 |
Design & Development |
Mon, Nov 13 |
Begin prototype building in 730 (other groups)
|
|
Tues, Nov 14 |
Meeting: 9:00 - 3:30 pm Commerce Lab I
- All immersion status update 11-12 (present status reports)
- Meet with Dr. Dabbagh 1-2 (if needed)
|
- Work
on Task Analysis
- Design & develop content for pre-shift and emergency and unusual situations duties in WC
|
Wed, Nov 15 |
Meeting: 9:00 - 3:30 pm Commerce Lab I
|
- Work
on Task Analysis
- Design & develop content for pre-shift and emergency and unusual situations duties in WC
|
Thurs, Nov 16 |
Meeting: 9:00 - 3:30 pm Commerce Lab I |
- Work on Task Analysis
- Design & develop content for pre-shift and emergency and unusual situations duties in WC
|
Fri, Nov
17 |
No face to face meeting
- Post Status Report
- Post reflection
|
|
Week
13 |
Design & Development
|
Monday,
Nov 20 |
Present Task Analysis and Objectives in EDIT 730
|
- Work on design document
- Design & develop content for pre-shift and emergency and unusual situations duties in WC
|
Tues, Nov 21 |
Meeting: 9:00 - 3:30 pm Commerce Lab I
- All immersion status update 11-12 (present status reports)
- Meet with Dr. Dabbagh 1-2 (if needed)
|
- Work on design document
- Design & develop content for pre-shift and emergency and unusual situations duties in WC
|
Wed, Nov 22 |
No meeting - thanksgiving recess |
- Work on design document
- Design & develop content for pre-shift and emergency and unusual situations duties in WC
|
Thurs,
Nov 23 |
Thanksgiving Holiday
|
|
Fri, Nov 24 |
No face to
face meeting
- Status Report
Due
- Contribute Reflections to Portfolio
|
|
Week
14 |
Design
Document & Prototype Presentation
|
Mon, Nov 27 |
Present the whole design/treatment document to the class in 730
|
|
Tues, Nov 28 |
Meeting: 9:00 - 3:30 pm Commerce Lab I |
- Design & develop content for pre-shift and emergency and unusual situations duties in WC
|
Wed, Nov 29 |
Meeting: 9:00 - 3:30 pm Commerce Lab I |
- Design & develop content for pre-shift and emergency and unusual situations duties in WC
|
Thurs, Nov 30 |
Meeting: 9:00 - 3:30 pm Commerce Lab I |
- Design & develop content for pre-shift and emergency and unusual situations duties in WC
|
Fri, Dec 1 |
No face to face meeting
- Status Report Due
- Contribute Reflections to Portfolio
|
- Work on final design document and final presentation
|
|
Week
15 |
Design Document & Presentation |
Mon, Dec 4 |
Dry Run Final presentation and prototype (EDIT 730)
|
- Work on final design document and final presentation
|
Tues, Dec 5 |
Meeting: 9:00 - 3:30 pm Commerce Lab I
- Work on prototype
- Work on final presentation
|
- Work on final design document and final presentation
|
Wed, Dec 6 |
Meeting: 9:00 - 3:30 pm Commerce Lab I
- Work on prototype
- Work on final presentation
|
- Work on final design document and final presentation
|
Thurs, Dec 7 |
Final Client Presentation for MSHA Team
|
|
Fri, Dec 8 |
Holiday Party!!!! |
|
Week
16 |
Design Document & Presentation |
Monday, Dec 11 |
Final 730 class
|
|
Tues, Dec 12 |
Meeting: 9:00 - 3:30 pm Commerce Lab I
- Summarize next steps and recommendations for spring semester
- Archive project materials
|
|
Wed, Dec 13 |
PAPER TOPIC and Proposal DUE to Dr. Dabbagh
|
|
Thurs, Dec 16 |
Congratulations!! You made it!!
|
|